(PECL gearman >= 0.5.0)
GearmanClient::addTaskLowBackground — Add a low priority background task to be run in parallel
$function_name
, string $workload
[, mixed &$context
[, string $unique
]] )Adds a low priority background task to be run in parallel with other tasks. Call this method for all the tasks to be run in parallel, then call GearmanClient::runTasks() to perform the work. Tasks with a low priority will be selected from the queue after those of normal or high priority.
function_name
워커가 실행할 등록된 함수
workload
처리할 직렬화된 데이터
context
태스크에 할당된 어플리케이션 컨텍스트
unique
특정 태스크를 인식하는데 사용하는 고유 ID
A GearmanTask object or FALSE
if the task could not be added.